Completed Project
that

S.N.

CLIENT NAME

PROJECT NAME

1

Client: ADNOC

RENOVATION OF POWER ID LAB G-LAB
003 AT ADNOC RESEARCH AND INNOVATION CENTER (ADRIC)

2

End User: ADNOC NGL Client: Larsen & Toubro

E&I works for Train 1, 2, 3 &4 as part of 5289 ADNOC NGL Ruwais Capacity Enhancement project.

3

Client : ADNOC Onshore

Provision of Well Integrity Services including Wellhead Monitoring, Sustained Annulus Pressures (SAP) Confirmation, Investigation, Pressure Bleed offs and related activities for Well
Integrity Management

4

End User: Al Dhafra Petroleum
Main Contractor: Larsen & Toubro

Haliba Field Development Projects

5

End User: ADNOC Onshore
Main Contractor: Robt Stone (ME) LLC

EPC Work for BATCH-IV (PMRFS),
Cluster Looping And Huwaila Surface Facilities

6

End User: ADNOC Gas Processing

AGR NO 4700015750 – REPLACEMENT SOLAR STREET LIGHT BATTERIES –
Habshan 5

7

End User: ADNOC Onshore
Client: Petrofac Emirates
LLC

PE-104 /04-004 – ADNOC Onshore
Qusahwira Field Development Phase II Project, ABU DHABI - UAE

8

End User: ADNOC Gas
Processing

OMH.21.188 ; Replacement Of Obsolete
UPS Critical Unit Phase-1 At Buhasa

9

End User: ADNOC Refining

Support Services For Maintenance Activities Of RFCC Co-Boilers, Slurry Circuit & RFCC Downstream At Ruwais
Refinery - I

11

End User: ADNOC (RAS/FERTIL)
Main Contractor: Al Mousawi Trading Co. LLC

Installation of Marine Gangways

12

End User: ADNOC Onshore
Main Contractor: Al Asab General Contracting Establishment

EPC for ASAB Phase II stage I Project from ADNOC - Onshore

13

End User: ADNOC Onshore Refining Main Contractor: TATA
PROJECTS

Improvement of Mussafah terminal firefighting facilities- E&I cable works

14

End User: ADNOC Onshore
Main Contractor: Robt Stone (ME) LLC

E&I works for EPC for the Bab Integrated Facilities project (BIEP) additional 17 wells

15

End User: ADNOC Onshore
Main Contractor: PETROJET

Cable laying, Testing, and commissioning of the Rumaitha & Shanayel Restoration project

16

End User: Dolphin Energy

Passive Shelter Coil Replacement

17

End User: Dolphin Energy

Maintenance Paintworks At Fujairah & QIDFA Station, Fujairah F2 Station, AFP,
MJP & MTP Block Valve Stations

18

End User: Dolphin Energy

LCR HVAC Roof Top Duct Cladding Installation

19

End User: Dolphin Energy

Pilot Burner Upgrade TRF Heater 860-H-
101

20

End User: Dolphin Energy

MAQTA Station HVAC Major Servicing

21

End User: Dolphin Energy

Al Ain Station Warehouse New Roof Panel Installation

22

End User: ADNOC Onshore
Main Contractor: AG
Facilities

Civil and E&I WORKS for Replacement of HSK/HCK Compressor and Steam Turbine & Upgrade, at Ruwais Refinery
(East) during Turnaround 2020

23

End User: Borouge
Main Contractor: Doosan Babcock

107714: Boiler Replacement Job at Borouge

24

End User: Robt Stone ME LLC

Installation, testing and commissioning of electrical works in RSME Habshan
camp

25

End User: ADNOC Onshore
Main Contractor CPEC/ National Contracting
Company

P02065 Al Dabbiya Surface Facilities- Phase III
Engineering, Procurement & Construction of 33kV Overhead
Transmission Line

26

End User ADNOC Onshore Main Contractor: Robt Stone / CPECC

P44010, Rumaitha / Shanayel Facilities- Phase III Rehabilitation Of Hot Oil System At Rumaitha CPP PH I

27

End User : GASCO ASAB
Main Contractor: Flowserve FZE

EPC for dry gas seal for ASAB - Compressors 22K-102 & 24K-201

28

End User : GASCO Main Contractor: Essar Construction Overseas LLC

Replacement of 16" Condensate Pipeline Project from Habshan to Ruwais of GASCO